Description


TECHNICAL DESCRIPTION
CONSTRUCTION
CONSTRUCTION
STAGES
F2 – Load-bearing structure
• Construction made of light metal profiles
• External structural panel
F3 – Shell construction:
Everything from F2 +
• Secondary roofing
• Roof covering / Roofing material
• Rough electrical and plumbing installations (without switches, outlets)
• Rough underfloor heating installations (pipe network without heat pump)
• Wall insulation
• Structural cladding of interior walls
F4 – Partial turnkey:
Everything from F3 +
• Facade (insulation, finishing layer)
• Final roofing and sheet metal works (gutters, flashings)
• Exterior joinery (windows, entrance door)
• Rough electrical and plumbing installations (without switches, outlets)
• Rough underfloor heating installations (pipe network without heat pump)
• Interior wall cladding (e.g., plasterboard or wooden cladding)
• Screeds or prefabricated floors
• Shelves
F5 – Turnkey:
Everything from F4 +
• Fine installation of electrical systems (switches, outlets, lights, intercom)
• Fine installation of plumbing systems (pipes, WC, shower, sinks, boiler)
• Heating and cooling (heat pump, air conditioning, thermostats)
• Final floor treatment (parquet, ceramics, vinyl, finishing strips)
• Final treatment of walls and ceilings (painting, wallpaper)
• Installation of sanitary equipment
• Painting works
• Building ready for furnishing and occupancy
ENERGY EFFICIENCY
<!–
–>
<!–
CATALOG
–>
Additional information
| Optional upgrades | 200 mm insulation, air conditioning, luxury bathroom equipment (Walk-in), metal substructure, canopy, standard version, luxury staircase, 4×3 m terrace with wooden decking |
|---|












Reviews
There are no reviews yet.